Wednesday, February 27, 2008

A quick update

As I type, the crew from Nationwide Flooring is here installing the floor (and the crowd cheers) in both the kitchen and laundry room. I've only really seen the laundry room's floor but it looks nice. All we need in there now is the mural and the toilet and that room is done.

I was out when they started the work, but Mark says it got real exciting. The dust that was stirred up caused the alarm to go off. Mark did let the alarm company know that it went off in error and they talked him through turning off the sensor until all the work is done. In the meantime, we found out the fire department can get here pretty quick. That's good to know for the future (I'm so going to need to bring them some sandwiches or something as an apology and thank you).

Shauna and Rachel from Kitchen and Bath Galleries were also over this morning to discuss what we can do about the light rail and I think we've come up with a good solution. We'll go with smaller lights under the cabinets and a smaller light rail. It'll still give us good lighting and a finished look. Now we need to get together with Chris and figure out which lights to choose.

Since they guys are still here installing the floor I'll try to post pictures later today. I don't want to get in anyone's way and delay getting this done.

No comments: