Greetings all, got a couple of emails last night from Chris and they are going to take care of the breezeway flooring. Chris and Rodney got together and agreed that the flooring isn't acceptable. So they've ordered two boxes of the flooring and are having them shipped express so they should arrive next week. Once the boxes acclimate they'll replace the section or if necessary the entire breezeway flooring.
This is why we chose Blue Ribbon Construction (http://www.blue-ribbon-construction.com/) , they work hard at making sure the customer (as in me) is satisfied with the job.
Vincent from Kitchen and Bath Galleries will be over to finish up the final touches to the cabinets and I sent an e-mail to Shauna last night letting her know the light trim I'm interested in. Bill, the electrician will be over today to finish up the wiring (gotta remember to let him know about the outlet in the banquette).
A slight change in topic here, we had a wild rain storm the other night, with our neighborhood suffering a number of fallen trees, power outages and in our case, our mailbox was knocked down. We've been wanting to replace the mailbox with a locking one but just hadn't gotten around to it. This now makes it a necessity so, we're going to look into having a stone foundation put in with the locking box integrated in the construction.
So, while the kitchen may be done soon, looks like the house projects (or as Mark refers to them "the Honey-do" list) are never ending.