Well, it's been a few days since I've updated this blog and mostly because all I'm doing is packing. What scares me is everything I've been taking out of these cabinets is going in to the new ones. Here I though I was going to be throwing out all this stuff and actually we haven't gotten rid of much.
Not much new happening with the project. Today, we met with the general contractor and the head carpenter and went over everything one more time. We did manage to choose where the dumpster and the port-a-john are going so I feel we accomplished something. We found out the kitchen walls will be taken down to the studs so it'll be easier to run the wiring and plumbing which I'm sure the cats are so going to enjoy checking out. We'll hear next week probably when they are actually starting the demolition.
The time line for the new cabinets installation is the beginning of January. As I understand it, the designer will be over about a week before the cabinets are installed to mark on the floor exactly where the cabinets are going so there won't be any confusion.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment